Fire door specialists · Installation · Remedials · Surveys

Fire door installation and remedial teams for UK contractors.

Experienced fire-door joiners for installation, replacement and remedial programmes, including occupied buildings. We confirm availability, scope and a project-specific quotation for every enquiry.

Midlands and London, with nationwide programmes considered

926
Head and jamb gapsTypically 2–4 mm, per test evidence
Intumescent + smoke sealsHead and both jambs, continuous
Threshold gapTypically 8–10 mm, or a drop seal
Three hingesUsual on FD30, as tested
9+Years delivering fire-door work
12,000+Fire doors installed
70+Projects completed
NVQ L2Minimum for every joiner

How many joiners does your job need?

Answer three questions to see the crew your job needs. Leave your email and we’ll send you the estimate with the assumptions behind it.

Crew calculator

Free · estimate sent by email

1What’s the work?

Estimated crew

2–3 joiners

For 240 fire doors of remedial work in 6 weeks.

Based on 3 to 6 doors per joiner per day over 30 working days.

Get this estimate by email

We send the estimate with the assumptions behind it, and reply within one working day if you want a quote.

Add site details for a firmer estimate (optional)

What applies?

Have a door schedule or inspection report? Mention it and we’ll ask for it when we reply.

Programmes our operatives have delivered.

Project experience of FIREHOLD’s operatives. Building names identify the sites, not our clients.

Former Convent of St Joseph, Lawrence Street, York

Student accommodation · York

Vita Student

750+

fire doors repaired

Remedial programme

Photo: Malcolmxl5, CC BY-SA 4.0

Red-brick student accommodation block beside a canal (illustrative image)

Student accommodation · Birmingham

YUGO Bentley House

200+

fire doors replaced

Replacement

Illustrative image

Entrance to Hightown Barracks, Wrexham

Defence estate · Wales

Hightown Barracks

40

fire doors replaced

Replacement

Photo: JThomas, CC BY-SA 2.0

The Summit, Leicester

Residential tower · Leicester

The Summit Tower

640

fire doors repaired

Under two months

Photo: JThomas, CC BY-SA 2.0

Before and after · our own work

Hover or tap a photo to see it before. Locations not shown.

01Exit doorset replaced
02Double doorset replaced
03Remedial · head and frame
04Remedial · frame corner
05Hinge replaced

Six checks every door has to pass.

If a door fails inspection, the contractor pays twice. Scroll to walk through the six checks an inspector makes.

Check 1 of 6

Gaps

Head and jamb gaps within the door’s tested tolerance: typically 2–4 mm, even all round.

We hang and adjust every leaf until each gap sits in tolerance, and we measure it.

Check 2 of 6

Threshold

Threshold gap as the test evidence specifies: typically 8–10 mm, or a drop seal.

Checked against the finished floor, not the subfloor.

Check 3 of 6

Seals

Intumescent and smoke seals as the test evidence specifies, unbroken and undamaged.

Fitted or replaced to the door’s test evidence.

Check 4 of 6

Hinges

Hinges as the test evidence specifies (usually three on an FD30 single), in the tested positions, every fixing in.

Non-fire-rated hinges and wrong ironmongery are replaced.

Check 5 of 6

Closing

Closes from any open angle and fully latches. Doesn’t stick, doesn’t slam.

Closers adjusted or replaced, latches aligned.

Check 6 of 6

Frame

Frame fixed to the structure, with the gap behind it sealed by a fire-rated system.

Architraves removed where needed to seal the structural gap.

From enquiry to sign-off.

Five steps, and something in writing at each one.

  1. Your scope

    01
    • Scope and work type
    • Site postcode and start date
    • Door schedule or inspection report, if you have one
    From you

    Step 01Project enquiry

  2. Scope notes

    02
    • Schedule, report and photos read
    • Site visit where needed
    • Labour support or a defined package agreed
    From FIREHOLD

    Step 02Scope review

  3. Quotation

    03
    • Project-specific price
    • Inclusions, exclusions and assumptions
    • Crew size and dates
    From FIREHOLD

    Step 03Availability and quotation

  4. Crew sheet

    04
    • Named operatives, NVQ Level 2 minimum
    • Start date confirmed
    • Inductions, access and working hours
    From FIREHOLD

    Step 04Mobilisation

  5. Handover pack

    05
    • QC check on every door
    • Photo record on every door
    • Sign-off with your team
    To you

    Step 05Delivery and sign-off

Who you’ll deal with

Artur Ratnieks, Director of FIREHOLD

Director

Artur Ratnieks

Artur runs FIREHOLD from Derby and manages delivery himself. He selects the operatives, every one CSCS-carded and a fire-door joiner with at least NVQ Level 2, and keeps the same people on a programme from start to finish. Crews work across the Midlands and London, with nationwide programmes considered.

“If it fails inspection, it costs more than doing it properly the first time.”

Direct line

You speak to the person who plans the crew, not a call centre.

Known operatives

Proven joiners we have worked with before, checked for qualifications and experience.

Same crew

Continuity of personnel across your programme, so standards don’t drift.

The questions contractors ask us first.

What qualifications do your operatives hold?

Every operative holds a CSCS card. Every fire-door joiner also holds at least NVQ Level 2, the qualification that shows they are trained to install and repair fire doors. Qualification records are available on request.

Are you BM TRADA or FIRAS certified?

No. Those schemes are held by the company that certifies and signs off the installation, usually the main contractor we supply labour to. We work to their procedures, each doorset’s test evidence and the manufacturer’s instructions. Where a project needs certified installation, we arrange third-party inspection and confirm what is required before we mobilise.

Are you SSIP, CHAS or Constructionline accredited?

Not at the moment. Main contractors hold these for their own tenders, and we work under them. If your tender or framework needs one, tell us early and we can put it in place.

Can you work in occupied buildings?

Yes. Most of our work is in hotels and student accommodation with residents in. Working hours, access and downtime are planned into the programme and the price.

How quickly can you start?

Send the location, scope and timeframe and we’ll confirm availability. We won’t agree to a programme we haven’t checked.

Why are you more expensive than a general carpenter?

Because this is compliance work. A door that fails inspection costs more to put right than doing it properly the first time.

Do you seal frames to the wall?

Yes. We remove architraves where required and seal the structural gap behind the frame with a fire-rated system.

Do you supply the doors?

No. We provide the people and the expertise. Doorsets, seals and ironmongery are supplied by you, or agreed in writing in the quotation.

What do we get at sign-off?

A QC check and a photo record for every door, then sign-off with your team.

Artur on site · internal fire doorset, start to finish

Jump to

We don’t just talk about fire doors. This is the work, filmed on site.

Use the crew calculator →